Architect Sample Resume


Matthew K. Smith
1234 Deer Ridge Drive
Overland Park, Kansas 66000
Home: 334-555-5555
Cell: 334-555-5556
Email: mksmith@frontfocus.com
  Objective: Architect to coordinate projects from initial inception through design to completed construction.   Qualification Summary:
  • Demonstrated experience with broad variety of projects
  • Ability to work in a fast-paced environment
  • Excellent communication, presentation and public relation skills
  Education: Bachelor of Science degree in Architecture
Auburn University, Auburn, Alabama
May 1996
  Work Experience: Architect, Reisler
Overland Park, KS 66000
Prepare information regarding design, specifications, materials, and equipment. Estimatecosts and schedules and other elements associated with construction projects. Developdesign ideas and create design presentations. Direct the production of construction documents, drawings, and specifications. Develop budgets and schedules to meet project objectives as well as value engineering principles. Organize client and team meetings.Coordinate schedules and workloads. Review architectural documents for potential conflict with all disciplines.
August 2004 - present   Architect, Western Century, Ltd.
Mission, KS 66000
Completed design work including schematics and cost estimates for in-house projects. Prepared engineering support for in-house projects. Conducted research such as deed or property studies and special reports needed to complete architectural projects. Performedan array of administrative duties related to architectural construction projects such as: code and zoning research, review contractor payments and utility bills, monitor project budget, and coordinate utilities installation.
September 1999 ? August 2004   Architect Assistant, Cobbs and Grant
Shawnee-Mission, KS 66000
Developed or assisted in the coordination of plans, designs and flow of development activities needed to ensure completion of architectural work for new construction projects. Conducted studies and special projects such as space planning, structural analysis, design feasibility and other related architectural engineering problems.
June 1996 ? September 1999   References: Furnished upon request

Related Articles